Customer Name |
Application |
Equipment |
Scope of work |
Date |
|
Svetogorsk pulp-and-paper plant (Svetogorsk, Leningradskaya region, Russia) |
||||
|
Paper machine #4 Storage tank control system |
Damatic systems |
Commissioning and start-up |
2001 |
|
|
Furniture cellulose sorting control system |
Damatic systems |
Installation, commissioning and start-up |
2001 |
|
|
Control system extension; Heat station #4, sodoregenerating unit |
ELMATIK system |
Installation, commissioning and start-up |
2000 |
|
|
Alkali liquor production for the boiling vessel via control system #2 |
Yokogava system |
Site survey, commissioning and start-up |
2000 |
|
|
Paper machine #1 Process control system |
Ñèñòåìû "Damatic" "Siemens" |
Site survey, optimization, installation, commissioning and start-up |
2000 |
|
|
Heat Stations #3,4 Boiler and deaerator control system |
Ñèñòåìû "OMRON" "Ìåòðàí" "Fisher Rosemaunt" |
Site survey and heat station #3,4 operation optimization |
2000 |
|
|
Knot pressure unit control system |
Damatic systems |
Installation, commissioning and start-up |
2000 |
|
| Sokol pulp-and-paper plant (Sokol, Vologodskaya region, Russia) |
Gas and steam energy metering system for bark boiler; steam metering for boiler house and evaporation |
ENERGY system (START) |
Project design, installation supervision, commissioning and start-up |
2000 |
| Paper plant GOZNAK (Saint-Petersburg, Russia) | Energy carrier metering system |
|
Project design |
2004 |
| Paper machine #4 mass preparation control system, ventilation control, electrical drive |
Damatic, Fisher Rosemaunt systems |
Project design, installation supervision, commissioning and start-up |
2000 |
|
|
Electrical energy commercial metering system |
ENERGY system (START) |
Project design, installation, commissioning and start-up |
2004 - 2006 |
|
| Suhona pulp-and-paper plant (Sokol, Vologodskaya region, Russia) | Gas commercial metering system |
LOGIKA system |
Project design, installation supervision, commissioning and start-up |
2001 |
| Svetogorsk pulp-and-paper plant (Svetogorsk, Leningradskaya region, Russia) | High pressure drive feeder |
|
Installation, setup |
2004 |
| Instrumentation and automation retrofit |
|
Installation, setup |
2004 |
|
| Paper machine #1 Loop control optimization |
|
Commissioning and start-up |
2003 |
|
| Heat Station #3, boiler #3 |
|
Commissioning and start-up |
2003 |
|
| Vyborgskaya Cellulose (Leningradskaya region, Russia) | Automation of 2 boilers BKZ-75 |
AMAKS system |
Project design, commissioning and start-up |
2002 |
| Vyborgskaya Cellulose (Leningradskaya region, Russia) | Automation system of yeast drying station |
Programmable controller DIRECT LOGIC by the company Direct by KOYO (Japan) |
Project design, delivery of equipment, installation, commissioning and start-up |
2003 |
| JSC “Goznak Saint-Petersburg” | Ventilation and air conditioning system of bank-note paper section |
Programmable controller DIRECT LOGIC by the company Direct by KOYO (Japan) |
Project design, delivery of equipment, installation, commissioning and start-up |
2002 |