Pulp-and-Paper Industry

Customer Name

Application

Equipment

Scope of work

Date

Svetogorsk pulp-and-paper plant (Svetogorsk, Leningradskaya region, Russia)

Paper machine #4 Storage tank control system

Damatic systems

Commissioning and start-up

2001

Furniture cellulose sorting control system

Damatic systems

Installation, commissioning and start-up

2001

Control system extension; Heat station #4, sodoregenerating unit

ELMATIK system

Installation, commissioning and start-up

2000

Alkali liquor production for the boiling vessel via control system #2

Yokogava system

Site survey, commissioning and start-up

2000

Paper machine #1 Process control system

"Damatic" "Siemens"

Site survey, optimization, installation, commissioning and start-up

2000

Heat Stations #3,4 Boiler and deaerator control system

"OMRON" "" "Fisher Rosemaunt"

Site survey and heat station #3,4 operation optimization

2000

Knot pressure unit control system

Damatic systems

Installation, commissioning and start-up

2000

Sokol pulp-and-paper plant (Sokol, Vologodskaya region, Russia)

Gas and steam energy metering system for bark boiler; steam metering for boiler house and evaporation

ENERGY system (START)

Project design, installation supervision, commissioning and start-up

2000

Paper plant GOZNAK (Saint-Petersburg, Russia) Energy carrier metering system

 

Project design

2004

  Paper machine #4 mass preparation control system, ventilation control, electrical drive

Damatic, Fisher Rosemaunt systems

Project design, installation supervision, commissioning and start-up

2000

 

Electrical energy commercial metering system

ENERGY system (START)

Project design, installation, commissioning and start-up

2004 - 2006
2009 - Second stage of project design

Suhona pulp-and-paper plant (Sokol, Vologodskaya region, Russia) Gas commercial metering system

LOGIKA system

Project design, installation supervision, commissioning and start-up

2001
2008 - 2009 - Second stage of project design

Svetogorsk pulp-and-paper plant (Svetogorsk, Leningradskaya region, Russia) High pressure drive feeder

 

Installation, setup

2004

  Instrumentation and automation retrofit

 

Installation, setup

2004

  Paper machine #1 Loop control optimization

 

Commissioning and start-up

2003

  Heat Station #3, boiler #3

 

Commissioning and start-up

2003

Vyborgskaya Cellulose (Leningradskaya region, Russia) Automation of 2 boilers BKZ-75

AMAKS system

Project design, commissioning and start-up

2002

Vyborgskaya Cellulose (Leningradskaya region, Russia) Automation system of yeast drying station

Programmable controller DIRECT LOGIC by the company Direct by KOYO (Japan)

Project design, delivery of equipment, installation, commissioning and start-up

2003

JSC Goznak Saint-Petersburg Ventilation and air conditioning system of bank-note paper section

Programmable controller DIRECT LOGIC by the company Direct by KOYO (Japan)

Project design, delivery of equipment, installation, commissioning and start-up

2002