Kirishi Oil Refinery Oil and Fuel Oil Tank-Wagon ON-SPOT Loading Station
End client: Kirishi Oil Refinery
Customer: FMC Europe SA (France)
Project description: Oil and fuel oil tank-wagon ON-SPOT Loading station was constructed at Kirishi Oil
Refinery by FMC Europe SA (France) project. The station accommodates loading of up to 60 tank-wagons from 2
rail-ways (30 tank-wagons each). Oil products are loaded based on the set weight using a Metler Toledo automated
weighing system.
- Loading equipment (loading devices, pipelines with shutdown and control valves, transportation equipment, etc.)
- Control & Information System for oil and fuel oil tank-wagon loading station
Control & Information System: SIEMENS AG PLC SIMATIC S7-300, Operator workstations based on Dell PC and
INTELLUTION software iFIX Dynamics HMI (USA)
Scope of work:
- Control & Information System design
- Fiber Optics Industrial Ethernet design
- Panel design
- Control system I/O
- HMI programming
- FAT
- Start-up & commissioning
- Operator & maintenance training
Control & Information System Architecture
|
 |
© SPIK SZMA 1998-2010. All rights reserved. |
SITE MAP |