Mozyr Oil Refinery LPG Plant Tank Farm
End client Mozyr Oil Refinery
Customer: Toshiba International Corporation, (USA)
Project description: LPG plant; retrofit and expansion of an existing tank farm
control system; pumps, loading, shipment and metering stations.
Tank Farm:
Existing:
- Tank Farms
- LPG loading pumping station
New:
- Propane-propylene fraction tank farms
- Butane-butylene fraction tank farms
- LPG loading pumping station #2
- Tank car preparation and inspection unit
- Station for LPG rail car loading
- Station for LPG tank truck loading
- Flares
- Industrial rainwater drainage pumping station
- Hot water preparation plant
- Monitoring of incoming product & energy
Control & Information System:
- Toshiba – DCS Tosdic-CIE DS
- Control loops – 15
- I/O signals –1000+
Scope of work:
- Control & Information System design
- Panel Design
- PLC & HMI programming
- FAT at Toshiba (Huston, USA)
- Start-up & commissioning
- Operator & maintenance training
Project reliability assessment was implemented using the SC ASLS SZMA.
Control & Information System Architecture